Masfoam keep it simple so that you can do it Right-First-Time.

Masitu produces the best foam-core lightweight moulding you can find in the market.

  • Basic Installation Method

    Installation process is as simple as cut-and-paste, thus significantly reduces the requirement of skill and labour at site, as a result, error during construction is greatly reduced. The overall result is time and money saving, while maintaining superior finishing quality.

    Web13-0058
    Web13-0061

    Measure and cut Masfoam to required length.

    Web13-0037
    Web13-0094

    Clean wall from surface contamination.
    Snap chalk line on the wall to use as a guide for the bottom of Masfoam.
    Put a few masonry nails above the line, at 300~600mm interval.

    Web13-0075
    Web13-0121

    Mix Masbond cement adhesive with water.
    Apply mixture onto the back of Masfoam.

    Web13-0180

    Fix Masfoam along the chalk line.
    Ensure that some of the mixutre is squeezed out of the edges.
    Remove excess mixture from the edges with putty knife.
    Remove smear with moistened cloth or brush.

    Web13-Step9

    Joints and Termination

    miterjoint

    Miter Joints

    Web13-0208
    buttjoint

    Terminations

    Basic Installation Method

  • Mixing Masbond

    Masbond MB525 Preparation

    1. Add Masbond MB525 to clean water in a container, to the ratio of 5:1 by weight(Kg).

    MixingMasbondWeight

    2. Stir the mixture for 5 minutes.
    3. Leave the mixture for 5 minutes.
    4. Stir the mixture again before application.

    MixingMasbond

    Application

    1. Use steel notch-trowel to spread a continuous coat of Masbond mixture onto the entire surface on the back of Masfoam. Create 10mm beads covering the perimeter as well.

    ApplyMasbond

    2. Place the Masfoam onto the substrate and firmly slide into position.

    Web13-0180
    Web13-0121

    Working time

    Masbond MB525 mixture must be used within 30 minutes upon mixing. It will start to set in the period and subsequently develops its full strength in 28 days, depending on the climate and temperature.

    min30
    Basic Care Maintenance

    Maintenance

    1. Masfoam surface can be painted and maintained with emulsion paint.
    2. Under-coat with water based sealer for best result.
    3. Accidental damages and cracks can be patched or filled with Masbond mixture.
    4. Minor cracks can be corrected by water based sealer or modified silicon filler.